Testimonials of Stakeholders - Putting Their Success On Repeat

Ready to
Repeat?

“The overall job is very satisfactory”

– Maintenance Manager

“Su compromise a los trabajos,con seguridade y eficiencia” (“Their commitment to the job, with safety and efficiency”)
– Chief Operating Officer

“Disponibilidad y conocimientode personal sin duda: lo major” (“Personnel availability and knowledge without doubt: the best”)
– Plant Director

 “The work ethics is very professional”
- Maintenance Manager

Ready to
Repeat?

“High level of safety being practiced during the complete execution which we do not find from local contractors who used to do in the past. This becomes utmost necessary with our corporate guidelines.”
– Chief Operating Officer

“The planning & en.a.ecution of job (tire buildup)is up to the mark … & result as per proposed target”
- Maintenance Manager

“Buena calidad de aporte en los trabajos” (“Good deposition work quality”)
– Plant Director

“The earthing system adopted by the team is unique and I hope with such fail proof system we can eliminate any sparks going into gear box bearings.”
– Chief Operating Officer

“We were surprised that in the last 9 years none of the welding companies had pointed out the wear beinghappening on the sides of the large diameter tire area and eventually the tire width had reduced and now it may not be possible to reweld fully. It is an eyeopener for us.”
– Plant Director

Ready to
Repeat?

“…the welding profile for the grinding plate as well as roller tire changed based on your process team recommendation and we hope that the relevant benefits we should get in operation.”
– Plant Director

“… very satisfied…”
– Maintenance Manager

“At the end of the rewelding job, your team had given the welding electrode consumption for the individual rollers as well as for the grinding plates. This was not practiced earlier by other welding companies. We were surprised to see that the welding quantity on two of the roller tyre were near to 50% of other rollers indicating uneven material flow across all rollers. This information is very good to optimize the feeding arrangement to the mill”
– Chief Operating Officer

“Rebuilding … completed w/ satisfactory performance."
- Maintenance Manager

The overall job is very satisfactory.

Maintenance Manager

Su compromise a los trabajos,con seguridade y eficiencia. (Their commitment to the job, with safety and efficiency.)

Chief Operating Officer

Disponibilidad y conocimientode personal sin duda: lo major. (Personnel availability and knowledge without doubt: the best.)

Plant Director

 The work ethics is very professional.

Maintenance Manager

High level of safety being practiced during the complete execution which we do not find from local contractors who used to do in the past. This becomes utmost necessary with our corporate guidelines.”

Chief Operating Officer

The planning & execution of job (tire buildup) is up to the mark … & result as per proposed target.

Maintenance Manager

Buena calidad de aporte en los trabajos. (Good deposition work quality.)

Plant Director

The earthing system adopted by the team is unique and I hope with such fail proof system we can eliminate any sparks going into gear box bearings.

Chief Operating Officer

We were surprised that in the last 9 years none of the welding companies had pointed out the wear beinghappening on the sides of the large diameter tire area and eventually the tire width had reduced and now it may not be possible to reweld fully. It is an eyeopener for us.

Plant Director

…the welding profile for the grinding plate as well as roller tire changed based on your process team recommendation and we hope that the relevant benefits we should get in operation.

Plant Director

… very satisfied…

Maintenance Manager

At the end of the rewelding job, your team had given the welding electrode consumption for the individual rollers as well as for the grinding plates. This was not practiced earlier by other welding companies. We were surprised to see that the welding quantity on two of the roller tyre were near to 50% of other rollers indicating uneven material flow across all rollers. This information is very good to optimize the feeding arrangement to the mill.

Chief Operating Officer

Rebuilding … completed w/ satisfactory performance.

Maintenance Manager

EN
DE ES PT EN